• Sommer-OL i Tokyo 2020

    Entre-Prises er eksklusiv leverandør av klatreveggene som skal benyttes under Sommer-OL i Tokyo 2020. Her presenterer vi en forhåndstitt på installasjonene som skal bygges for den olympiske kombinertøvelsen i klatring.

    Read More

  • Alpamayo Klimcentrum, Beringen

    Location Beringen, Belgium Climbable area 1100 m2  Date December 2016 Height 18 m  Wall type Climbing facility Width   Technology MozaïK Max. overhang 5 m Configuration Bouldering & Rope walls Number of lines 50 Climber profile All types of climbers Options Freeform Tufa Plexiglas

    Read More

  • Modjo Escalade, Rennes

    Location Rennes, France Climbable area 574 m2  Date July 2016 Height 7.8 m (rope wall) Wall type Climbing facility Width 92 m (bouldering) Technology MozaïK Max. overhang 3,5 m Configuration Bouldering & Rope walls Number of lines 11 Climber profile All types of climbers Options –

    Read More

  • Vertical Ocean Camp, La Rochelle

     An Entre-Prises solution This is where the Entre-Prises standard Deep Water Solo wall was born. Our engineers developed a standard, ultra-light structure that could be installed in three days and taken down in two. Our MozaiK technology was chosen for the build, to provide route setters with large flat surfaces that could accommodate large numbers […]

    Read More

  • Commrow Whitney Peak Hotel, United States

     An Entre-Prises solution The final design, called the “double barrel”, offers climbers a new concept in urban climbing: multi-pitch climbing for cities. The structure consists of two major routes of two different lengths, providing 50 metres of climbing above the city centre’s crowded streets. We also installed a 15m official speed wall, and routes for […]

    Read More

  • Deep Water Solo Exeter 2014

    An Entre-Prises solution The Entre-Prises designers ensured maximum visibility by developing a structure that could be installed on a floating pontoon. The wall was positioned facing the quay to give spectators the best possible view of the show. Pour le mur, nous avons utilisé notre surface MozaiK We used our MozaiK surface for the wall, […]

    Read More

  • IFSC World Climbing Championships – Bercy 2012

    An Entre-Prises solution Entre-Prises designed “the World Cup Boulders”World Cup Boulders » : Eight different modular climbing faces that can be assembled according to route setters’ and customers’ needs and wishes. These faces can be arranged in various configurations. The faces can either be fixed to a support or arranged in free-standing assemblies of two or four. […]

    Read More

  • Tignespace Climbing Facility, Tignes

    An Entre-Prises solution Entre-Prises has designed and installed a national-standard climbing structure consisting of three separate areas: Une zone de pan A systems board area to be used for physical work-outs, instruction, or as a warm-up area for competitions. Un mur initiation A beginners’ wall including a large vertical section for initiation in the sport. […]

    Read More

  • The Roof climbing facility, la Rochelle

    An Entre-Prises solution Apart from the quality of our products, our proximity and responsiveness were significant factors in winning this contract. By talking to our customer we were able to perfectly pinpoint their requirements and propose simple shapes with large faces to accommodate as many macros as possible. This would provide perfect modularity and inspire […]

    Read More

  • The Boardroom Climbing Ltd, United Kingdom

    An Entre-Prises solution La technologie MozaiK MozaiK technology for greater flexibility in route setting 50 climbing routes up to 10m high World Cup boulders and other boulders up to 4.8 high An 8 metre “psicobloc” wall with a large landing area. A dedicated training area, systems board, campus board, and gym rings. A specially designed […]

    Read More